How to design overlapping operations #710
Replies: 1 comment
-
|
Transfer batching is a deprecated feature that will be removed soon. The alternatives:
|
Beta Was this translation helpful? Give feedback.
-
|
Transfer batching is a deprecated feature that will be removed soon. The alternatives:
|
Beta Was this translation helpful? Give feedback.
Uh oh!
There was an error while loading. Please reload this page.
-
I'm looking for a way to design an overlapping production process. Overlapping because the first step don't have to be finished for the complete manufacturing order to start working in the 2.nd operation.
For example the wood table with 2 steps:
When producing 100 parts and there are enough resources (2 people on 2 workplaces) the second operation can start, when the first part is finished in the first operation. The planing time then reduces from the sum of the 2 steps to a significant smaller time.
In the documentation i found an deprecated feature called transfer_batch but now this workflow should be realised with operation_dependencies and operation_material_offset. I don't really have an idea ho to design such overlapping operations with this tools.
thanks for your feedback
Beta Was this translation helpful? Give feedback.